Hi,
You can also find this information in LR User Manual ,
If you have multiple lr scripts in a project , and each case have long run times and you want to run them squentially, u can schedule the scipts' run times . In this example scripts gonna run sequentially.
But also if you have multiple Load Generators you can you can assign specific load generator to scripts as you want.
To use this feature you have to change mode as "Group Mode"
Cause of i select group mode before you see Percentage Mode . But when you try it in percentage mode you will see Convert Scenario to the Group Mode.

For sequential run scripts Double-click on start group row. Then select the group you want to run before the choosen group.
That's all. Don't hesitate to ask questions.
Thank you for reading.
Onur
0 comments :
Post a Comment